Rigging and power
Compact Cam-Lok power distribution
Plan power distribution together with the venue supply and the event’s intended demand. The compact Cam-Lok reference alone does not identify the model or its ratings; the unit and assembly must be reviewed against their documentation with the qualified person responsible.
Identification and scope
- Manufacturer or brand
- Check the identification on the unit
- Equipment name
- Compact Cam-Lok power distribution
- Location
- Ask about availability and location
- Availability reference
- Listed as available in the record; current status to confirm
You can start with the equipment you need to power, the date and the location even if the final list or complete diagram is not ready yet. We will review the venue information and supply options to prepare the proposal.
Information to prepare this item
- Component identification, nameplate and documentation; actual assembly configuration.
- Intended voltage, connectors, protection and supply, with a qualified person’s review of the actual configuration.
Identify the unit and proposed distribution
Gather the unit manufacturer, model, nameplate and documentation, together with identification of the intended cables and connectors. The Cam-Lok name does not confirm voltage, current, phases, protection or compatibility for a specific assembly.
Prepare the equipment list and the supply information provided by the venue for technical review. Required outputs, their allocation and cabling must be defined for the proposal; they cannot be inferred from the distribution unit’s size or appearance.
Prepare the details for reviewing event power
| Point | What to record | How to proceed |
|---|---|---|
| Unit and documentation | Model, nameplate, diagram and intended components | Gather references for the qualified person’s review |
| Supply and demand | Venue information, equipment to power and intended use | Review the required configuration with the qualified person responsible |
| Outputs and path | Proposed destinations, cables, connections, access and route | Define the scope and coordination of the documented distribution |
The qualified person responsible reviews the supply, protection, connections and assembly condition. Record the information and discrepancies they need to assess; this page prepares the inquiry and does not provide a connection, disconnection or energized handling sequence.
Topics to discuss
- Component identification
- Configuration and documentation
- Assembly coordination
- Inspection and recordkeeping
Before applying settings, identify the complete equipment variant and consult its documentation.
Continue the inquiry
- What to coordinate with the hotel or venue before AV setup
- Event stages: choosing size, height and access
These guides cover related tasks. Check the model each guide addresses before applying its settings to this equipment.